“The STEPOC system makes it possible to build almost anywhere, enabling plots previously thought too difficult to develop a viable proposition as it requires no mortar, no drying time and no waiting. It is solid as a rock and no specialist skills are required for installation – so general labourers with no bricklaying skills can do the work.“The client clearly wasn’t getting the most out of his garden and he employed Bolton-based Redford Construction to carry out the work which has required 50 tonnes of STEPOC blocks to do the job. STEPOC are hollow blocks which allow for reinforcement bars to be inserted and for concrete to be pumped down through the interconnected cavities in the blocks."
“The ground was shifting quite a bit and there were also a lot of trees. We sought advice from a structural engineer as it was clear a substantial retaining wall was needed and the STEPOC system was agreed to be the best solution of the options considered.“We dug a toe into the actual ground, and it was important to accurately place the starter bars into the foundation. The first course of blocks was laid into the mortar and they needed to be completely level. The next step was to drill and fit in the vertical bars – in all we built-up 11 courses using STEPOC.”
“The garden will be backfilled to make it level and, ultimately, we will create a terrace. The STEPOC system was the best for the job because of its usability, the minimisation of waste and reducing the amount of materials to be brought on-site like shuttering and plywood."
Similar Stories...